Warning: No part of this site may be reproduced, stored in a retrieval system or transmitted in any form without the prior permission of the website owner is strictly prohibited

Pensions - Extension of Time Limit for Obtaining of Annual Verification (Life) Certificates

 

Pensions - Extension of Time Limit for Obtaining of Annual Verification (Life) Certificates

Cir.Memo.No.D4/1381/2019 (Comp.No.1131573) Dtd: 23/03/2021

Sub: P.S- T& A Dept.,- Pensions- Extension of time limit for obtaining of Annual Verification (Life) Certificates upto 15.04.2021- Instructions- Issued- Reg.

DOWNLOAD CIRCULAR

Previous
Next Post »
0 Komentar

Google Tags