MBNN Phase 2 - Centrally Procured
Materials (CPM) - Certain Implementation Procedures
నాడు -నేడు
ఫేజ్ 2
కి సంబంధించి కేంద్రీకృత సేకరణ మెటీరియల్స్ (CPM) అందించు మెటీరియల్ వివరాలు, STMS లో ఇండెంట్ పెట్టి అమలుచేయు విధానాలతో సర్కులర్ జారీ
Circular No.
1767977/22-23/MBNN, Dated: 01-07-2022
Sub:-School
Education- Department -MBNN-Phase-II- Centrally Procured Materials (CPM) -
certain Implementation procedures- Communicated- Regarding.
Mana Badi Nadu Nedu
program is being implemented to improve infrastructure facilities in Government
Schools /Educational Institutionsin AP state. It is a prestigious flagship
program of Government of Andhra Pradesh. In order to maintain uniform standards
and best quality materials/ services, certain items are being procured
centrally through APEWIDC.
In the STMS the
facility of uploading the requirements / indents of the material required is
enabled. The following materials are going to be supplied centrally.
"Water supply Sanitary items, Roof Slab Water Proofing & Ceiling
Treatment, Powder Coated GI Doors, Ceramic Tiles for Toilets, Electrical
Fixtures & Fittings, Ceiling Fans, Dual Desks, Green Chalk Boards, GI Windows,
Painting to the Buildings, Drinking Water System and English Lab (Smart TVs for
primary Schools).
Certain
implementation procedures are to be followed in indenting these items. The
items are being procured for certain functional utility, specific use and
specific location for which these items are to be indented. These issues are to
be kept in mind while raising the indents in STMS for Centrally Procured
Items/Products.
0 Komentar